A lazy image

Precast Concrete Stairs manufactured for project at 35 Shelbourne Road

Flood Precast worked with MAC Group in providing 48no Precast Stairs and Pump Station Precast Slabs for the development at 35 Shelbourne Road.

Every precast concrete stair flight is designed in accordance with BS EN 1992-1-1. They are available in various configurations, from a single stair flight to a complete precast stairwell with landings. Precast landings can be attached or separate to the top or bottom of the precast stair flight. Flood Precast’s casting systems enable the majority of precast stairs to be produced from multi adjustable steel or timber moulds giving a high quality surface finish to all stair faces.

A construction of 35 Shelbourne Road, Ballsbridge, Dublin 4. This 120,000 sq. ft. commercial building commenced in June 2018 consisting of a single storey basement car park, 6 floors and a terrace. This commercial building 7 storeys over basement with a gross floor area of 11000m2.

Project: IPC House, Shelbourne Road, D4.

Client: Mac Group

Engineer: Garland Engineering

Architect:  RKD Architect

Products: 48no Precast Stairs and Wideslab

For more information on our range of concrete products contact our team at enquiries@floodprecast.com

Don’t forget to connect with Flood Precast on LinkedIn