Etap Hotel Manchester

Contractor: PCE

Engineer: AMP

Architect: 5plus Architects

Developer: 5plus Architects

This new chain of the IBIS Hotel for the budget Hotels operator ETAP has been built at Pollard Street Manchester, UK that is in keeping with the group’s award-winning scheme for new hotels throughout Europe.

These project was part of a fast track contract which was completed in just over nine months.

The advantages of using Flood Precast products are:

  • Pre-stressing for the deflection limits.
  • Solid slab for the fire rating.
  • Wet casting on steel mould beds for the high quality soffit finish. Reduction in building height.
  • Faster erecting time on site using precast products.
  • Better sound insulation.
  • Thermal mass and natural ventilation Exposed solid Wideslab are an excellent heat sink which is critical for natural ventilation.

Project Details

Sectors: Hotels

Specification: Wideslab

Contact Us

Contact Flood Precast to find out more

By your side from design, to manufacture, to installation.

Contact Us