A lazy image

Production and transport scheduling teams worked hard to facilitate fast turn-around for works at The K Club using Flood Super Wideslab

 

By harnessing the advantages of Flood Super Wideslab®, Contractors and Engineers can deliver real value for their clients.

Project Information: The K Club

Project Team:

Contractor:  M.B McNamara Construction Ltd

Engineer: OCSC

Architect: Henry J Lyons

Timescale: 3 Months

Sq. Metres: 3500 m2 of Flood Super Wideslab® and 24 Precast Concrete Stairs 

Solutions:

Requirement of a Fire Escape:  Our precast concrete stairs and landings were used to satisfy this requirement. As our stairs have high quality finish they are then left exposed therefore giving a cost saving and a benefit to the programme.

Exposed Soffit and no suspended ceilings in the bedrooms:  Our Flood Super wideslab concrete flooring was suitable for this application as it can be painted onto directly. 

K_Club_ceilings_soffit

Precast concrete is more suitable for exposed soffits because the finish can be of higher quality than concrete cast in situ. In this case, the joints were feathered out before the paint application and that because the wideslab units are 2.4m wide we could reduce the amount of joints to one per bedroom. Also the exposed concrete finish adds to the aesthetic appeal of the building.

This project was under a very tight time-scale schedule. Flood Precast working together with the site management team to complete deliveries and work on time within the tight two week turn-around between floor construction.

In addition of  Flood Super Wideslab® high thermal mass, construction speed and shallow profiles, this precast concrete product offers many additional advantages, when compared with Omina and Hollowcore concrete following.

For more information on our range of concrete products and Flood Super Wideslab® contact our team at info@floodprecast.ie