Flood Precast we’re delighted to be appointed as sub-contractor to Kier Construction to provided precast offsite solution of precast slabs and stairs the redevelopment of Harrow Multi-storey car park. The main structure of the building was designed as steel frame, with prestressed slabs at the depth of 75 mm with a layer of 100 mm […]
