Standground Academy, Peterborough

Contractor: Kier

Engineer: PEP consultancy

The Stanground Academy opened in the surviving buildings of the former Stanground College. This major capital building programme costing £24m and was completed in September 2013 and now provides state-of-the-art amenities and beautifully designed and finished buildings for students and staff.  These fantastic new buildings provide high quality academic, vocational and sports facilities.

Benefits of using Wideslab

  • Up to 50% faster on-site installation times
  • Wider, longer, shallower, stronger.
  • Verrsatile casting and reinforcement options
  • High-quality soffit finish – optimised thermal mass potential
  • Widely used alternative to Hollowcore

Project Details

Sectors: Education

Products: Wideslab

Specification: Prestressed Wideslab flooring units

Contact Us

Contact Flood Precast to find out more

By your side from design, to manufacture, to installation.