A lazy image

New A&E department using Flood Precast Concrete Products.

Flood Precast worked in conjunction with sub-contractor Harrington’s Builders in providing this project with the following flood precast concrete products.

  • 3000sqm of Precast Hollowcore flooring
  • 24no Precast Stairs.

This project has been described as “ground-breaking”. This development cost £49 million and is set to revamp and expand Wexham Park Hospital’s Accident and Emergency (A&E) department. Frimley Health NHS Foundation Trust chief executive Sir Andrew Morris said: “We have been planning this since 2014 so I’m really excited to be starting building work on something that will be a huge asset to the health of local people for decades to come.”

Benefits of using Precast Concrete Floors

  • High load capacity and efficient design make long spans achievable
  • Reduces the need for load-bearing walls
  • Allows for greater flexibility in design
  • Less formwork and scaffolding
  • Immediate safe working platform after installation
  • Reduced construction programme
  • Site progress not subject to weather

Benefits of Using Flood Precast Concrete Stairs

  • Quick to install
  • High fire resistance.
  • High-quality finish. Class B finish available upon request.
  • Minimal site labour
  • Savings in construction time.

Project: Development at Wexham Park Hospital, Slough.

Sub-Contractor: Harringtons Builders Plc

Engineer: BDP

Architects: BDP

Products: Precast Concrete Stairs and Hollowcore

For more information on our range of concrete products contact our team at info@floodprecast.ie

Don’t forget to connect with Flood Precast on LinkedIn