A lazy image

Benefits for Homeowners Precast Concrete Floors in New 2 Story Homes in Co. Dublin

Flood Precast recently completed the safe installation of precast concrete floors for first-time homeowners in Clongriffin, Co Dublin using Flood Precast Super Wideslab®. The benefits of using precast concrete floors for homeowners has resulted in it fast becoming the industry standard. Concrete Home are Better Built Homes How do they compare to Different House Types: […]

A lazy image

Capital Docks – Ireland’s Tallest Building 24000m2 of Hollowcore Flooring.

Irish contractor John Sisk & Son is involved in this build of a 660,000sq ft mixed-use development at Capital Dock, a prime waterfront site in Dublin’s south docklands. This will be one of Ireland’s Tallest Building where Flood Precast has been involved in the design, manufacture and supply of 24000m2 of Hollowcore flooring which is […]

A lazy image

Cost-effective precast flooring solutions for Dublin development

Flood Precast designed, supplied and installed precast concrete stairs and Flood Super Wideslab® at this Dublin city development. Both Irish and UK weather conditions and new building regulations generate challenges for all builders. Precast Concrete can meet these challenges with timesaving and cost-effective precast flooring solutions. For example, rapid installation of structural floors provides quickly […]

A lazy image

Key Construction dates met using flood precast concrete flooring slabs.

Flood Precast designed, manufactured, supplied and installed Hollowcore Flooring for Roof Slabs for DAA Pier 1 Extension. This project had an accelerated programme with key construction dates that needed to be met. We supplied our last slabs on the delivery date 19th January 2017. Works were completed at the Pier 1 Extension at Dublin Airport […]

A lazy image

Precast Stairs and Post Fit Angle Bracket System used for development.

This development consists of 4 RC Frame blocks ranging up to 14 storeys with a central courtyard and underground parking. Precast stairs were designed,manufactured and installed to all 11 stair cores using a post fit angle bracket system. Flood Precast worked with Ground Construction Ltd who was the piling contractor with Higgins Construction as the […]